For Gas Safe registered engineers

Professional RAMS from a two-line job brief

Type what the job is. Get a complete risk assessment and method statement with the usual gas hazards, their mitigations and exactly what has to be done for each one — plus hospital, supervisor and contractor sections ready to sign.

Example brief

"Swapping a 20 year old back boiler for a combi in an occupied 3 bed terrace, new 22mm gas run from the meter box, loft flue, two operatives, two days."

  • /18 rated hazards with controls
  • /14 step method statement
  • /GSIUR 1998 / BS 6891 / IGEM references
  • /ACS competency requirements
  • /Emergency + hospital section
  • /Operative briefing sign-off sheet

What lands in the document

Gas-specific hazards

Gas escapes, CO, purging and tightness testing, hot works, plant rooms, asbestos, electrical isolation — rated on a 5x5 matrix with real control measures.

Full method statement

Sequential steps from site set-up and isolation through to tightness testing, purging, re-commissioning, FGA readings and handover.

Emergency section

Nearest A&E hospital, first aider, assembly point and the national gas emergency number, ready to be filled in or confirmed.

Reusable library

Every document is saved. Duplicate a similar job and you are 30 seconds from the next RAMS.

Print / PDF export

The on-screen document is the document. One click gives you a clean A4 PDF for the client or principal contractor.

Your company on it

Company details, Gas Safe number and insurance are stored once and dropped onto every document automatically.